Vai al contenuto principale
UNIPD
DICEA
TUTORIAL
CONTATTI
Italiano (it)
English (en)
Français (fr)
Italiano (it)
Pannello laterale
Home
UNIPD
DICEA
TUTORIAL
CONTATTI
Altro
Italiano (it)
English (en)
Français (fr)
Italiano (it)
Ospite
Login
Home
UNIPD
DICEA
TUTORIAL
CONTATTI
Apri indice del corso
M4.3-MOSC
Practical part (Days 6-8)
Practical part (Days 6-8)
Scarica cartella
1_GreenFieldAnalysis
1. Green Field Analysis(GFA).xlsx
2. GFA 1. Results 2(SIM).xlsx
3. GFA 1. Results 2_Different Locations(SIM).xlsx
4. GFA 1. Results 1(SIM).xlsx
2_NetworkSimulationTransportOptimization
1. NO Distribution Network inside 4 Walls Models.xlsx
2. NO Distribution Network inside 4 Walls Models Capacity Restriction.xlsx
3. TO Distribution Network inside 4 Walls Models.xlsx
4. SIM Distribution Network inside 4 Walls Models.xlsx
5. SIM Distribution Network inside 4 Walls Models_New Inventory Policy.xlsx
6. SIM Distribution Network inside 4 Walls Models_New Inventory+New Transportation.xlsx
3_ProductionSourcing
1. Four-Stage SC (Pessimistic scenario).xlsx
2. Four-Stage SC (Optimistic scenario).xlsx
3. Four-Stage SC (Optimistic scenario, increased capacity).xlsx
4. Four-Stage SC (Optimistic scenario, dual sourcing).xlsx
4_RiskAnalysis
1. BWE.xlsx
2. BWE_High Inventory_Short Production Time.xlsx
5. Four-Stage SC (Optimistic scenario)_Ripple Effect_No Disruption.xlsx
6. Four-Stage SC (Optimistic scenario)_Ripple Effect_With Disruption.xlsx
8. Four-Stage SC (Optimistic scenario)_Ripple Effect_Back Up DC.xlsx
5_Exercises
BR GFA Level 1.xlsx
BR NO Level 1.xlsx
BR SIM Level 1 Disruption Risk 2 DC.xlsx
BR SIM Level 1 Disruption Risk with 1 DC.xlsx
BR SIM Level 1.xlsx
PB GFA Level 1.xlsx
PB NO Level 1_Constrained.xlsx
PB NO Level 1.xlsx
PB SIM Level 1_Improved.xlsx
PB SIM Level 1.xlsx